Yuhuan Fengmu Machinery Co., Ltd.

Technical Services

FAQ


For the first time in 1., the greenhouse rolling machine will be powered on. It will be rolled up for about 1 meter. Look at the straightening condition of the thatch curtain. If the thatch curtain is not straight, the reasons for the straightness can be analyzed according to the specific situation, and the straightening measures will be taken. In this operation, no matter whether the thatch curtain is straight or not, the greenhouse rolling machine should be retreated to the initial position. The purpose is to test run, one is to make the grass curtain roll solid, and the other is to carry out slight running-in on the greenhouse rolling machine.

2. the second power transmission operation, the greenhouse rolling machine is rolled up to about 2/3 of the position, and step 1 is repeated. the purpose is still to promote the further rolling of the straw curtain and to carry out moderate running-in on the greenhouse rolling machine. Then, the greenhouse rolling machine is returned to the initial position again.

3. to see whether the grass curtain rolled up neat, straight, whether there is a deviation phenomenon; if found the above phenomenon should continue to adjust until it meets the practical requirements. Finally, the adhesive safety label is firmly posted on the appropriate part of the main rod of the greenhouse rolling machine to show that the user pays attention to the safe operation.

Before the third power transmission of the 4., carefully check whether the motor and the greenhouse rolling machine have obvious temperature rise, abnormal sound and peculiar smell. If the temperature rise does not exceed the ambient temperature of 40 ℃, and no abnormal sound or peculiar smell is found in the greenhouse rolling machine, the third power transmission operation can be carried out to make the greenhouse rolling machine in place.

In the debugging process must also pay attention:

1. before use, the greenhouse rolling machine body to inject the right amount of oil (the specific number according to the size of the rolling machine), after the annual replacement.

During the rolling and unrolling process of the 2. greenhouse shutter machine, the operator must stand on the two mountains of the greenhouse with a switch in hand. It is strictly forbidden to stand in front of the shed, and stay away from the main machine and the rotating straw curtain and heat preservation quilt.

3., when the curtain rolling machine rolls up to 30cm on the roof of the greenhouse, it must stop. In case of brake failure, please quickly set the reverse switch to the reverse (reverse) direction to make the rolling shutter machine lower normally and then repair it.

Types of film winder 2024-10-08 10:48:23.386

The electric film roller is now the ventilation equipment, which has brought a lot of convenience to the majority of growers. Therefore, it has been loved by growers and has also been used to install the electric film roller. Here is an introduction to the installation method of the electric film roller. Before installing the film winder, first prepare the necessary materials, steel pipes, and film pressing cards. The 25mm galvanized pipe used for the steel pipe and the 25mm galvanized pipe shall be used for the film pressing card.

After the materials are ready, the installation will begin. Before installation, it is necessary to determine whether the greenhouse is ventilated at the top or measured. The top ventilation must first be made into a telescopic rod. The telescopic rod is relatively simple to make, that is, a thin tube is inserted into a thick tube. If it is to install the test volume, it is relatively simple. A fixed wing root pole in the greenhouse will do.

The electric film winder can also be connected to an automatic temperature controller, so that the temperature in the greenhouse can be known by using a mobile phone thousands of miles away. According to the needs of vegetables for temperature, the film winder can be turned on or off according to the temperature to realize complete automatic management.

Greenhouse film roller should be filled with antifreeze gear oil. During installation and use, always check whether the host and the screws at each connection are loose, whether the welding is broken or open welding and other problems. After each use, the total power supply outside the shed should be cut off in time.

The following is a brief introduction to the safe use:

1, according to the greenhouse length, width, camber and the weight of the agricultural film, according to the standard selection of the appropriate host, pay attention to leave a load margin, prohibit full load and overload operation, and take necessary security measures for the motor.

2, according to the weight of the roll film, according to the standard with support rods, push rods, roll rods, bolts, to avoid the rod is equipped with unreasonable folding rod, twist rod.

3. Cables and other power distribution equipment purchased by users should be qualified products that meet national standards to ensure the safety of electricity and the safe operation of the host.

4. Fix the reverse switch on the main support rod, and add a control knife switch in front of the reverse switch to ensure that the power supply can be cut off in time when the reverse switch fails.

5. The host has already added enough qualified lubricating oil when leaving the factory, and the user does not need to rejoin it.

6, ice and snow weather to clean up the cold film after the start of the film winding device, to prevent damage to the agricultural film due to rain and snow icing.

7. It is forbidden to touch the winding rod when the film winder is rolled and placed. After the film winder is rolled in place, it should be shut down in time to prevent the film from turning offside into the shed.

8. During installation and use, when the vertical rod and roll rod are deviated, the user should adjust, straighten and tighten the bolts in time to ensure the normal operation of the host and rods and extend the service life.

The facility greenhouse is a building with lighting covering material as all or part of the enclosure structure material, which can be used for planting plants in winter or other unsuitable open-field plants in the growing season.

1. Common facilities greenhouse

The facility greenhouse can be divided into single building and multi-building according to the plane layout, metal structure and non-metal structure according to the main structure material, and soft covering material and hard covering material according to the type of covering material. In Zhejiang and other southern provinces, commonly used facilities for the greenhouse steel frame shed, glass greenhouse, solar panel (PC) greenhouse, shelter shelter, shade shed, such as the characteristics of the shed.

(1) Steel frame greenhouses The most widely used steel frame greenhouses are prefabricated hot-dip galvanized steel pipe greenhouses. ① Single steel frame greenhouse, the span of the greenhouse is 6~8 meters, the shoulder height is 1.5~1.8 meters, the top height is 2.5~3.3 meters, and the length is 30~70 meters. Its basic skeleton composition includes arch rod, rod, vertical rod (for shed heads at both ends), diagonal brace, referred to as "three rods and one brace". ② multi-span steel frame greenhouses, with a single span of 6~8 meters, a gutter height of 2.5~3 meters, a top height of 4.2~5 meters, and a length of 30~60 meters. There are main and auxiliary columns, and some are equipped with internal and external shading and heat preservation screens. The pipe diameter of the steel frame greenhouse is 22mm, 25mm, 32mm, the pipe wall thickness is 1.2~1.5mm, the inner and outer walls are hot dip galvanized, and the plastic film is used as the covering material.

(2) glass greenhouse commonly used 5mm thick float glass or double insulating glass for transparent covering material, glass inlay material using aluminum alloy profile, glass edge and aluminum alloy profile joint using anti-aging rubber seal. The span of the glass greenhouse is usually 6.4 meters, 9.6 meters, 12.8 meters, the gutter height is 3~4 meters, and the open room is 4 meters. The advantages are good light transmission, good heat preservation, dust easy cleaning, long life. The disadvantage is that the impact resistance is poor, the cost is high, and the structure is mostly stria-style spire shape.

(3) sunshine board (PC) greenhouse sunshine board is a transparent covering material with polycarbonate as the main raw material, including single-layer wave board, double-layer or three-layer transparent hollow sunshine board, the skeleton adopts hot-dip galvanized steel frame assembly type. The advantage is heat preservation, sealing, good impact resistance, the disadvantage is that the surface is easy to accumulate dust, not easy to clean, high cost.

(4) Avoidance canopy Avoidance canopy is composed of cement columns, steel pipes, etc., mostly "Y" or "umbrella" structure, the top covering material is mostly plastic film, surrounded by ventilated non-buckle film or buckle insect net. In rainy spring and summer, crops can be protected from direct rain leaching, thereby reducing disease. It is mostly used for rain shelter cultivation of fruit trees, fast-growing leafy vegetables, etc. or summer seedling raising.

(5) Shade shed Shade shed is a cultivation facility that provides shading for plant growth. The pillars and rungs are built with hot-dip galvanized steel pipes. The pillars are fixed on the ground and covered with sunshade nets with different light transmittance according to the different needs of plants. The height is about 2 meters. To put it simply, the role of the shade shed is to shade and cool down in the summer and autumn strong light and high temperature seasons; in the early spring and late autumn frost seasons, it plays a certain role in protecting plants from frost.

(6) Characteristic shed Characteristic shed refers to the shed specially designed and manufactured for some agricultural production, such as bayberry steel frame net cover shed, aquaculture facility breeding shed, loquat shed, etc.

How to maintain the mattress? 2024-10-08 10:50:02.662

1. The newly purchased mattress may have a new odor due to long-term sealed packaging. As long as the indoor air circulation is maintained or placed in a ventilated and cool place for 72 hours, the odor will be significantly reduced.

2, flat on a smooth, breathable bed surface, so that the mattress uniform support and ventilation.

3. When using, avoid local stress on the pad surface, so as not to cause local depression and deformation of the mattress to affect the service life.

4, should be used to avoid acute angle instruments or knives and other scratched fabrics.

5, the use should be kept dry, to avoid liquid leakage, high temperature ironing or fire damage pad surface.

6. When using, it is recommended to put on a mattress cover or a good quality sheet to avoid soiling the surface of the mattress.